Accra Mayor directs closure of Kaneshie footbridges over safety issues

Accra Mayor, Hon. Michael Kpakpo Allotey, has ordered the temporary closure of the Kaneshie footbridges after an inspection revealed serious structural concerns that could endanger lives.
Speaking during the inspection on Wednesday, Mayor Allotey assured residents that urgent measures would be taken to protect the public while repair works are initiated. He also called on traders and commuters to vacate the bridges immediately. “The Assembly will not take chances with public safety, especially given recent structural failures in the city,” he stressed.
He warned that anyone defying safety protocols or attempting to use the bridges unlawfully would face legal consequences. In a separate interview with the media, the Mayor added that preliminary repair works would begin using the Assembly’s Internally Generated Funds (IGF), with additional support expected from the central government.
“Parts of the bridge have deteriorated badly, with metal reinforcements exposed through broken concrete. The situation is urgent,” he said, urging residents to report unsafe buildings and developments in their communities. The Mayor emphasized that the Assembly would act promptly to enforce compliance with engineering standards.
Mayor Allotey also announced plans to collaborate with other Metropolitan, Municipal, and District Chief Executives (MMDCEs) across Accra, including Adenta, School Junction, Dansoman, and Agbogbloshie, for joint inspections and enforcement drives targeting unsafe structures. The coordinated effort, led by Greater Accra Regional Minister Hon. Linda Obenewaa Akweley Ocloo, will ensure non-compliant developments face corrective action, including potential demolition where necessary.
Hon. Frank Nkansah, Municipal Chief Executive for Ablekuma Central, explained that the persistent occupation of the footbridges by traders over the years had contributed to the deterioration of critical components, including barriers and footings. He highlighted that rust and structural damage had become visible, complicating maintenance efforts.
Supporting the decision, Engr. James Oduro Amoo-Gottfried, Director of the Department of Urban Roads, acknowledged that the bridges were in poor condition and needed immediate attention. He said alternative pedestrian routes along the Dr. Busia Highway median would be established, allowing residents to cross safely while repair works are ongoing.
Mayor Allotey commended the public for cooperating so far and reiterated his administration’s dedication to building a safe, resilient, and sustainable city. “Ensuring safety, improving infrastructure, and enforcing regulations remain central to our work,” he concluded.
Discover more from Today Ghana
Subscribe to get the latest posts sent to your email.


UNGA81: Early childhood facilitators must be well-trained and well-paid – Dr. Apaak
Dr. Apaak urges govts to invest more in early childhood education, calls for 10% of education budgets
Dangote’s endorsement of Mahama a major boost for Ghana’s investment outlook – Anatu Bogobiri Esq
UNGA81: ECCE must be integrated into Ghana’s foundational learning strategy – Dr. Apaak
UNGA81: Global South must take full control of its health systems – Mahama
Dangote’s confidence in Mahama gives strong mileage to Accra Reset Agenda – Anatu Bogobiri Esq